STR and CAL (23 Feb - 20 Mar 2015) delivered to Kiruna Team

First bunch of processed CAL and STR covering period between 23.02.2015 and 18.03.2015 (for STR) and 22.03.2015 (for CAL) have been delivered to ESA for Baseline C switch in production.
Second bunch covering period between 19.3.2015 and 24.03.2015 (for STR) and between 23.03.2015 and 25.03.2015 (for CAL) will be delivered soon